This 60-Foot Party Dock Will Blow Your Mind! | Lake Docks and Decks S1

This 60-Foot Party Dock Will Blow Your Mind! | Lake Docks and Decks S1

Brief Summary

This video documents the transformation of a dilapidated dock on the Smith family's private island into a luxurious and functional waterfront space. The project, led by Marshall Black, involves demolishing the old structure, building a new and larger dock, adding floating docks, and incorporating amenities like an outdoor kitchen, kayak ramp, and entertainment features. Despite challenges like design changes and a miscut countertop, the team completes the project in three weeks with a $75,000 budget, creating a dream waterfront retreat for the Smiths.

  • Demolition of old, unsafe dock
  • Construction of new, larger dock with kayak ramp
  • Installation of outdoor kitchen and entertainment features
  • Addressing challenges like design changes and miscut countertop

Introduction

The Smith family's dock has been neglected for 20 years and is now in a state of disrepair. They want to transform it into a space for relaxation and entertainment. Marshall Black aims to create a deck and dock area that fulfills their dreams of a perfect waterfront retreat.

Meet the Smiths

Marshall Black introduces the Smith family, who own a 2-acre private island where they've spent decades creating memories. Steve Smith wants to update their old dock into a luxurious space for relaxation and water enjoyment. The island holds sentimental value for the family, especially after the passing of Steve's wife, Kathy. The current dock is rotting and unsafe, making it difficult to use and enjoy.

The Vision

The goal is to create a wonderful family atmosphere where the Smiths can create lasting memories. Marshall recalls building a deck for Steven's wife Kathy, who wanted her own special section. Now, the plan is to demolish the old dock and build a resort-like space. Steve envisions a place where friends and family can relax, enjoy the sauna, and have a glass of wine by the water. Marshall aims to create a resort-like space where they can relax and enjoy their time.

The Plan

Marshall plans to replace the existing dock with a larger structure and add two floating docks for ample entertaining space. He will improve access to the sauna and include amenities like speakers, a kayak rack, an outdoor kitchen, and a bar. The project is scheduled to be completed in 3 weeks with a budget of $75,000.

Demolition and Discovery

The demolition of the old dock begins. As the crew dismantles the structure, they hope to find some "treasure" underneath. Upon reaching the foundation, they discover that the dock is in worse condition than anticipated, with the support beams completely deteriorated.

Building the Frame

With the old dock removed, Marshall begins planning the layout of the new dock. He marks the high water mark and identifies rock formations to anchor the structure. The team drills into the rocks to install beams, creating a sturdy foundation. Marshall laminates a thick beam to span the water, ensuring stability and preventing bounce in the deck.

Rethinking the Design

After installing the main beams, Marshall realizes he missed an opportunity to add a kayak ramp. He decides to reposition one of the beams to create a natural passage for kayaks, prioritizing functionality and aesthetics over square footage.

Customizing the Joists

The team begins laying in the joists, custom-cutting each one to fit the irregular rocky terrain. This process is time-consuming but essential for creating a level surface. Cedar deck boards are chosen for their natural resistance to water and rot.

Adding the Decking and Stairs

The deck boards are installed, providing a flat working surface. Stairs are added to improve access to the dock level, replacing the steep old ramp with a gentler slope and a flat landing. The dock's shape is slightly altered from the original plan, resulting in ample living space and a dedicated area for a kayak ramp.

Outdoor Kitchen Construction

The team prepares to build the outdoor kitchen area, assembling a system designed for outdoor living that is resistant to rust, weathering, and warping. The kitchen includes a barbecue, garbage disposal, and a paper towel rack, providing convenience for outdoor cooking.

Countertop Troubles

After working on the kayak rack, the team focuses on the finishing touches for the outdoor kitchen. However, they discover that the stone countertop was cut incorrectly, throwing a wrench into the project timeline.

Floating Docks

To stay on schedule, Marshall decides to outsource the construction of the floating docks to a supplier. He orders two 10x20 or 12x20 floating docks with 8x8 ramps, ensuring a stable and maintenance-free addition to the waterfront. The floating docks arrive and are easily installed.

Final Touches and Reveal

With only one day left, Marshall focuses on the final details, including installing the replacement countertop for the outdoor kitchen. He aims to have everything perfect before Steve arrives. Steve is amazed by the transformation, praising the wide and stable floating docks. Marshall reveals the repurposed storage shed, new stairs, re-angled ramp, and the outdoor kitchen with a fridge and high-end barbecue.

Additional Features

Marshall highlights the kayak ramp, adjustable for water level, and the kayak rack. He also reveals hidden rock speakers for music. Steve is thrilled with the new space, recognizing it as a legacy for future generations.

Share

Summarize Anything ! Download Summ App

Download on the Apple Store
Get it on Google Play
© 2024 Summ